Imperial Vista Project Update for August

27 Aug Imperial Vista Project Update for August

THE PEAKED TERRACES

Excavation has been carried out (7,400 sqm) and foundations laid for over 3,500 sqm, while DPC slabs of 3,500 sqm has been casted.

Blockwork for floor area of about 6,600 sqm has commenced while suspended slabs with area of 4,700 sqm have been casted.

There has been installation of roof beams for area 1,050 sqm and roof structure for an area of 700 sqm put to place.

M&E installations for area of 65 sqm External plastering and screeding for area of 300 sqm has been executed and external painting will commence soon.

Internal plastering and screeding for area of 60 sqm has started and internal painting will commence afterwards.

ARROW-HEAD DUPLEXES

There has been excavation of 1,800 sqm and foundation laid for area of 1,800 sqm.

DPC slabs with area of 1,800 sqm have been casted with blockwork for floors covering the area of 2,920 sqm and suspended slab with area of 1,360 sqm.

Roof beams for area of 340 sqm and roof structure for area of 340 sqm have been installed with the inclusion of 70 sqm of roof coverings.

M&E installations for area of 640 sqm as well as external plastering & screeding for area of 640 sqm have been executed.

External painting for area of 640 sqm. Internal plastering & screeding for area of 640 sqm.

HEXAGON COURTYARDS

Excavation for area of 3,600 sqm and foundations for area of 3,600 sqm have been carried out and laid with DPC slabs with area of 3,600 sqm casted.

Block-work for floors with the area of 5,400 sqm has started and suspended slabs with area 4,795 sqm casted with roof beams of 300 sqm and roof structure for area of 300 sqm installed after with works to begin on roof covering.

M&E for an area of 900 sqm have been installed, external plastering & screeding for an area of 900 sqm executed and external painting for area of 880 sqm done. Internal plastering & screeding for area of 900 sqm has also been completed after which Internal painting will commence.

LANDSCAPING

As important as the houses is the environment and Promoting beauty & serenity is one of our core values.

Grass has been planted on a surface of over 2,500 sqm, with 386 Trees and shrubs planted. Several decorative elements have also been installed.

Infrastructure

Earthworks for roads with length of 2,520 m. Stonebase 1st layer for roads with length of 2,470 m. Kerbs for roads with length of 4,570 m. Stormline with length of 3,630 m. Sewerline with length of 1,380 m. Gully pots installed 192 no. Cesspools with a total capacity of 486 cbm.

We weight very much importance on the creation of FCC Standard infrastructure in our projects as this is an integral part of sophisticated and convenient living within a luxurious environment.

“In executing quality projects, we are able to provide our investors with opportunities that would be carried on for generations, while expanding our reach and surpassing our goals.”

Gallery

August Focus

As we have made significant progress towards design executions and quality structural delivery, this August we would be focusing on the completion of our show houses both externally and internally. This is a huge leap for our investors as this gives a clear insight of what each category on delivery would look like, helping to better visualize the final finishing.

On the exterior, completion of the landscaping will be done including aesthetic additions to the external structure such as lighting and ornaments. Internally, there would be overall focus on POP, Tiling and Cladding works, including fixtures, fittings and interior decorations.

We are excited about August, and hope you are too!